指导
网站地图
澳洲代写assignment 代写英国assignment Assignment格式 如何写assignment
返回首页

UNIVERSITY OF CENTRAL LANCASHIRE-Castor Assembly Manufacture

论文价格: 免费 时间:2011-11-25 11:32:20 来源:www.ukassignment.org 作者:留学作业网

UNIVERSITY OF CENTRAL LANCASHIRE
SCHOOL OF COMPUTING, ENGINEERING & PHYSICAL SCIENCES
MP3674 MANUFACTURING SIMULATION
Assignment 2 -- Castor Assembly Manufacture
This assignment is worth 60% of the total module mark
The following Module Learning Outcomes are addressed in this assignment:
• To analyse the manufacturing requirements of a product and to develop appropriate process plans.
• To design an appropriate manufacturing system with due consideration of relevant options.
• To design, build, test and improve an appropriate simulation model(s) in the analysis of a manufacturing problem.
• To analyse a manufacturing system and its associated performance characteristics.

A manufacturing company is considering setting up a unit to manufacture a small range of Castor Assemblies. There are 4 basic products:

2470DIK100P50
2470PJO100P50
2470PJP100P50
2470UAP100P50

These products are based on a similar design with all parts being identical apart from the wheel centres and wheel tread

Weekly orders are expected to have the following pattern:

Model Initial Orders: Orders in 12 months time:
2470DIK100P50 2500 4000
2470PJO100P50 1500 2500
2470PJP100P50 1000 1500
2470UAP100P50 500 800

Total
5500
8800

The company intends to rent a unit on an industrial estate in the Preston area in Lancashire, thus moving into what would effectively be a ‘greenfield site’.

The castor assemblies are to be manufactured according to the attached specifications – the version to be manufactured in each case is in the larger photograph.


You are required to produce a report for the company management that contains the following:

No. Description Marks
1. A list of all parts contained within the products Indicate whether they are to be manufactured ‘in house’ or purchased. Justify your decisions. 5
2. For the parts to be manufactured ‘in house’, draw up process plans, describe operations, estimate operation times, specify machines, etc. Use technical illustration where appropriate. 5
3. For the assembly operations, draw up plans, describe operations, estimate operation times, specify equipment, etc. Use technical illustration where appropriate. 5
4. Using suitable illustration, design a prototype system. Discuss the design options that are most appropriate at this stage, e.g. different equipment layouts, different systems of working, etc. State any assumptions that you make. This should indicate the approximate dimensions of the layout, equipment, etc. 20
5. Using the above information, build an Arena model of the manufacturing system. This should produce the appropriate statistical information for analysis. Also, it should be easily understood by senior management – the best way of achieving this is through the use of animation. 40
6. Utilising the Output and Process Analyzers, analyse the results. Modify the model in order to improve its performance and re-run the simulation. Discuss the critical factors of the system, i.e. what changes have the most significant effect. Make recommendations to management. 25#p#分页标题#e#
100

YOU ARE REQUIRED TO SUBMIT THE FOLLOWING:

No. Description
1. A disc containing all relevant Arena files e.g. model files (*.doe), picture libraries (*.plb), etc. The model must be able to be run from the disc on a networked PC.
2. A word-processed report with all sections as described in the marks allocation table.

NOTE: Information downloaded from the Internet must be read, understood and edited before using it in this report. All information used from any source must be correctly referenced.

Please post your submission to the appropriate assignment collection box on the first floor of the C&T Building.

SUBMISSION DATE: WEDNESDAY 4th MAY 2011

PENALTY FOR LATE SUBMISSION:
All assessments submitted late, but within 5 working days of the deadline, will be given a maximum mark of 40%. Assessments submitted more than 5 working days after the deadline will not be marked, and a mark of 0% will be recorded.

CASTOR ASSEMBLY SPECIFICATIONS


CASTOR WHEEL – PRODUCT RANGE
SIMILAR PARTS MANUFACTURING DETAILS











 

此论文免费


如果您有论文代写需求,可以通过下面的方式联系我们
点击联系客服
如果发起不了聊天 请直接添加QQ 923678151
923678151
推荐内容
  • 国外大学怎么写assignm...

    很多即将留学海外或初次留学海外的学子经常会问:国外大学怎么写assignment?其实,assignment并不难写,只要你能够了解并熟悉assignment的......

  • 硕士课程论文格式样本:Pop...

    assignment格式样本:All pop art draws upon modern images of cultural icons, consumer ......

  • 英文Assignment和D...

    英文Assignment和Dissertation的写作细节(珍藏版)-Dissertation大体结构-Dissertation写作思路-Dissertati......

  • 怎么写assignment?

    怎么怎么写assignment?:assignment格式...

  • 麦当劳在澳大利亚的管理问题研...

    本文是麦当劳在澳大利亚的管理问题研究assignment指导。现如今,德管理对全球市场上的公司取得持续发展和长期成功来说是及其重要的。大多数的麦当劳餐厅都提供柜......

  • 从女性黑人说唱音乐中看美国传...

    本文是本站代做的assignment范文,有关女性解放问题。人们都认为黑人女说唱音乐应该不受传统观念的束缚,它应当是创新的、能够促进黑人女性解放的,并且能够提高......

923678151