assignment问题: This location seems to have one of the best stormwater resources of all sites (good year-round flows) but the current stormwater system is old, unreliable and is considered by RCC to be largely underutilised. RCC, therefore, wishes to investigate the feasibility of upgrading the system (pump-house and storage facilities) to more adequately meet the site needs. There is an aqueduct from Avoca St. all the way to Coogee Beach where it is currently discharged as a shoreline outfall. Investigate the feasibility of upgrading the existing pump and storage/treatment infrastructure. Consider the feasibility of extending the irrigation network from thehttp://www.ukassignment.org/daixieAssignment/daixieyingguoassignment/ Goldstein Reserve to the nearby Grant Reserve, and compare this with the alternative option of building an onsite stormwater treatment/storage unit at Grant Reserve to meet the Reserve’s irrigation and public amenity needs. It may be that for all water using systems to operate simultaneously, the construction of additional water storage capacity is necessary?
小组写的assignment提纲: 1. background study of Cooge Beach storm water ( just a quick research on it history so it look like a proper report) 1.2 Introduction (can be quickly done 2. water balance (done) (main body) 3. Upgrading the old Pump 3.1 how much will this cost???include labor cost. 3.2 LCA of this approach 3.3 total time of this Approach 4. Extending the tank to different Reserve 4.1 need a pipe network?pipe design 4.2 will this require a pump station ? 4.3 how much will this approach cost??include labor cost. 4.4 LCA of this approach 4.5 total time of this Approach?? 5. Building a new Grant Reserve storage 5.2 what will be the new storage capacity (gonna need the storage Volume from water balance, perhap sam can help on this <<<) 5.4 LCA of this approach? 6. MCA- analysis 7. conclusion ( pick the best suitable approach out. Then explain y) 8. Reference 9. Appendices
|