论文题目:3个题
论文语种:英文
您的研究方向:项目管理
是否有数据处理要求:是
您的国家:美国
您的学校背景:一般重点
要求字数:100
论文用途:硕士预科作业
是否需要盲审(博士或硕士生有这个需要):否
补充要求和说明:三个题,高手2小时就完。注意有些地方要画结构图
1. table: the final cost estimation
Management’s expectation of the project final cost had better to be control below $480000. the baseline is not more than $481250.
2. Analysis of “Gimli Glider” case
In the case, risk event is that the FQIS could not work properly and calculation of amount of oil was error without adding enough fuel (only carrying requirements half of the fuel). The impact is B767 in northern Canada at an altitude aerospace of 40,000 feet, spent all fuel, and had to gliding descends to a former air force base in Manitoba Gimli. The risk drivers were the FQIS which can not work properly and the error calculation of metric and imperial. The impact driver was that the electric system and hydraulic system also lost power and air force base taken as landing points when the plane dropped to 28,000 feet high. The way of calculating loss can be The accident total losses L = accident direct economic losses + accident indirect economic losses + accident direct non-economic loss + accident indirect non-economic loss. The expected loss might be more than $100.
3.Decision tree:
From the fraph above we can know the executive committee should spend $7 million to continue with the particular research project. Because finally it can still get profits of $9.2 million, so it can choose to continue the project.
|